Search

Calculate how much he earns
power plant with smart control

Fill in the form and we will submit the calculation to you immediately.

Based on the meteorological data from your location and the data you enter, we will calculate the yield of the PV plant.

The calculation is approximate. The actual number of panels that your roof can accommodate, including other parameters, can be determined by a technician. In this case, please contact us to schedule a technical inspection.

Anything not clear?
Get back to us.

Hotline: 800 440 460
E-mail: info@somias.cz

    Power plant parameters?

    Contact details

    Loading...

    Calculating the earnings of the power plant

    SOMI power plant with smart power control ? kWp and battery capacity ? kWh would have earned you in the last 12 months ?.

    What is the difference between SOMI and a conventional power plant without smart controls?

    Last 12 months

    ?
    Conventional photovoltaic power plant
    ?
    SOMI photovoltaic power plant

    The calculation is only indicative and assumes that the panels are oriented to the south. If you want to know the exact number of panels and the recommended parameters of the power plant for your residence, have a non-binding detailed a tailor-made offer.

    Based on the satellite images of your house and the specified parameters, our project team will prepare a non-binding offer including prices and quantification NZU subsidies.

    From plan to reality

    How SOMI implements intelligent installations
    photovoltaic power plants?

    Play video

    How to get a smart
    SOMI photovoltaic power plant

    01
    Complete and submit non-binding inquiry, we will send you a customized calculation within 3 days.
    02
    You will be contacted by a sales representative who will discuss the procedure and details of the implementation with you, sign the contract and pay the deposit.
    03
    You will be visited by a technician who will then draw up the project documentation.
    04
    We will handle all the documentation including the application for subsidy for you.
    05
    We will carry out the installation within a few weeks, at the latest within 4 months after signing the contract.
    06
    The subsidy will be paid within 6-9 weeks after the first parallel connection.

    Want to know more?

    Get a no-obligation quotation or read our FAQs.